Construction of Butalangu Water Supply and Sanitation Scheme Nakaseke District

Brief description of the works

  • Construction of 2no. pump stations complete with 2 pump houses, 1 guard house, 1 Ecosan toilet, 2 production wells and fencing of the sources

  • Construction of water office block with water borne toilet, 6 house hold Ecosan toilets and 2 institutional line (VIP) pit latrines

  • Construction of 4 water kiosks

  • Construction of 600 private yard connections

  • Construction of 1.1km transmission pipeline of OD 110MM Upvc PN10.

  • Construction of 25km distribution pipeline.

  • Supply ad installation of electromechanical works and 3 phase power extension

  • Supply and installation of a 200m3 pressed steel cold-water reservoir tank elevated on 12m high tower.

  • Chlorination and sterilization.

Project Info

  • Start Date :

    22th April 2018

  • Duration :

    12 months

  • Client :

    Min. of Water & Environment

  • Sector :

    Infrastructure

  • Partner :

    Sarick Construction Ltd

  • Beneficiaries :

    Nakaseke District local government