Brief description of the works
Construction of 2no. pump stations complete with 2 pump houses, 1 guard house, 1 Ecosan toilet, 2 production wells and fencing of the sources
Construction of water office block with water borne toilet, 6 house hold Ecosan toilets and 2 institutional line (VIP) pit latrines
Construction of 4 water kiosks
Construction of 600 private yard connections
Construction of 1.1km transmission pipeline of OD 110MM Upvc PN10.
Construction of 25km distribution pipeline.
Supply ad installation of electromechanical works and 3 phase power extension
Supply and installation of a 200m3 pressed steel cold-water reservoir tank elevated on 12m high tower.
Chlorination and sterilization.
Readable and Packages editors now use Lorem Ipsum as their default model textlayout. The point of using the some is that it has a more-or-less normal distribution of letters as opposed to using.
Readable and Packages editors now use Lorem Ipsum as their default model textlayout. The point of using the some is that it has a more-or-less normal distribution of letters as opposed to using.
Readable and Packages editors now use Lorem Ipsum as their default model textlayout. The point of using the some is that it has a more-or-less normal distribution of letters as opposed to using.
“Readable and Packages editors now use Lorem Ipsum as their default model textlayout point of using the some is that it has a more”
Rebecca Tylor
Water, Sanitation & Irrigation